YSP Separation Type (A, B, C, D Type)

YSP system is highly functional diaphragm system which maximized function of sound blocking, fire-resistance, insulation by joining color steel plate and gypsum board. By using color steel plate it is possible to express variety of colors and installation of windows and doors can be done simply. Also it is a system which can be installed or disassembled easily thus it is suitable to internal diaphragm and column cover and appropriate for GMP facility requiring cleanness in particular.

  • Product outline
  • Product drawing
  • Information for construction
  • Miscellaneous

General description of YSP Separation Type A-Type

YSP Separation Type A-type is a system whereby panel made by attaching gypsum board to color galvanized steel plate is assembled by top channel, skirting, stud and after installing sound absorption and insulation material then finished joint by 120 mm steel or aluminium joint cover.

(1) Terms

  • YSP DRY WALL: Wall attached with YSP panel after installing light steel structure stud and runner

(2) Transportation and handling

  • ① Transportation: Record type, name, dimension, manufacturing date etc. on label and pack and transport.
  • ② Handling: Handle it according to instruction of the manufacturer and requirement of the user.

Product of YSP Separation A-type

(1) Standard material

  • ① Quality of material: galvanized color steel plate
  • ② Color: 4 types of standard colors

(2) Insulation, filler: gypsum board 12.5 mm, glass fiber over 24K

(3) Standard dimension

  • ① Thickness:66mm, 76 mm, 101 mm, 126 mm
  • ② Width: 900 mm
  • ③ Standard length: 2700 mm

Special feature of YSP U Type A-type


  • * Adjustment function is convenient by using adjust body.
  • * By virute of multiple panel sound blocking is excellent.
  • * Adaptation to site is excellent through carrying out work for panel by separation.
  • * Work can proceed by separation accordingly disassembly and transfer are convenient.
  • * Color lasts long by use of K.S. color metal plate

3.1 Advance site survey

  • (1) According to request on the works by the client verify the place and extent of works progressed. The works shall not start before inadequate work condition is completely corrected.

3.2 Preparation for works

  • (1) Panels and appurtenant materials received shall be off loaded from truck in the condition identical to the time of delivery of goods from warehouse. Panel to be lifted up shall be made to stand at column or windowless wall to expedite its movement at the time of its transportation.
  • (2) When lifting is delayed it shall be stored at a place which is higher than other floor and dry and clean and shall be supported sufficiently to prevent its damage.

3.3 Standard for execution of works

  • (1) Check extent of level finish of floor and check on whether or not manufactured panel and ceiling height are proper for works and when adjustment is required standard position shall be decided.
  • (2) Center of the line shall be matched to center of joint of ceiling materials and next wall shall comply with position which is decided according to position of wall or column or lighting fixtures.
  • (3) Works always shall start from corners.

3.4 Interference to works

  • (1) On the line for installing panels there shall be no interference such as lighting equipments, sprinkler or other interference.
  • (2) If any interference occurs request supplementary measures to the client and after such action is taken start the works.